2019/20 Roy's Off Season Gallery
|
|
|
Lots of straw stalactites at this endRoy
|
|
Another refuge shows the blue engineering brick with red brick aboveRoy
|
|
The ceramic number plate lets the platelayers and gangers know how far they are into the tunnelRoy
|
|
This one has two metal rungs at the topRoy
|
|
Calcified water running down the wallRoy
|
|
Back outside now. A cable hanger post alongside the trackbed.Roy
|
|
The tunnel parapet hasn't fared so wellRoy
|
|
It's hard to imagine that a railway line went through the cutting belowRoy
|
|
Heading back to Diggle finds more cable hanger posts in amongst the treesRoy
|
|
A southbound train about to cross over the foot tunnelRoy
|
|
Bridge 69 leads to the foot tunnelRoy
|
|
One of the locks shows how narrow the canal isRoy
|
|
Built to lastRoy
|
|
An overflow drain on the canalRoy
|
|
|
1852 files on 124 page(s) |
|
|
4 | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|