Last additions - 2020/21 Roy's Off Season Gallery
|
The spoil heaps were brought up the shafts when the tunnels were constructedRoyFeb 26, 2021
|
|
As it looked in 1959. The building at the far end contained the pumping engine.RoyFeb 26, 2021
|
|
The same view now minus the annexes at either endRoyFeb 26, 2021
|
|
Inside view of the engine houseRoyFeb 26, 2021
|
|
A medieval appearanceRoyFeb 26, 2021
|
|
Filled-in archways, and evidence of the attachment points for the engineRoyFeb 26, 2021
|
|
A portal to the underworld awaits at each endRoyFeb 26, 2021
|
|
A mixture of water and diesel fumes rise up after a train has passedRoyFeb 26, 2021
|
|
A blocked up spoil chute at the top of the 'Downcast Shaft'RoyFeb 26, 2021
|
|
A yellow flare looking like a person with upstretched armsRoyFeb 26, 2021
|
|
The bottom of Redbrook Downcast ShaftRoyFeb 26, 2021
|
|
Looking down the 'Upcast Shaft' which is over the Canal Tunnel as a blast of air comes up from the depths RoyFeb 26, 2021
|
|
The view into the eye of the demonRoyFeb 26, 2021
|
|
Looking up Redbrook Upcast Shaft from belowRoyFeb 26, 2021
|
|
The inclined tramway to Pule Edge quarryRoyFeb 26, 2021
|
|
1127 files on 76 page(s) |
|
|
|
|
|
|
|
|
|
|
|
31 | |
|
|
|
|
|
|
|
|
|
|
|