Stoxnet Photo Galleries

BriSCA F1 Stock Car Racing

Last additions
8_The_deterioration_of_the_tunnel_portal.JPG
The deterioration of the tunnel portalRoyApr 24, 2021
12_The_only_remaining_support_beam_still_in_situ_with_some_large_cracks_in_the_adjacent_brickwork.JPG
The only remaining support beam still in situ with some large cracks in the adjacent brickworkRoyApr 24, 2021
13_The_decay_is_unbelievable.JPG
The decay is unbelievableRoyApr 24, 2021
14_This_whole_section_has_collapsed.JPG
This whole section has collapsedRoyApr 24, 2021
15_The_tunnel_is_lined_with_cast_iron_support_rings_which_were_originally_braced_with_poling_boards.JPG
The tunnel is lined with cast iron support rings which were originally braced with poling boardsRoyApr 24, 2021
16_A_red_brick_repair__The_blue_brick_roof_is_heavily_sooted_.JPG
A red brick repair. The blue brick roof is heavily sooted.RoyApr 24, 2021
16a_What_lurks_within.JPG
What lurks withinRoyApr 24, 2021
19_This_refuge_has_collapsed.JPG
This refuge has collapsedRoyApr 24, 2021
20_Chisel_marks_are_visible_on_the_rock_at_the_back_of_the_refuge.JPG
Chisel marks are visible on the rock at the back of the refugeRoyApr 24, 2021
21_Rusting_and_corroded_support_rings.JPG
Rusting and corroded support ringsRoyApr 24, 2021
22_An_ankle_breaker_if_you_re_not_watching_your_step~0.JPG
The drain cover was further inside the tunnelRoyApr 24, 2021
23_The_drain_cover_was_further_inside_the_tunnel.JPG
The drain cover was further inside the tunnelRoyApr 24, 2021
25_The_view_up_the_first_ventilation_shaft_at_350_yards_in.JPG
The view up the first ventilation shaft at 350 yards inRoyApr 24, 2021
27_Inside_the_tunnel_with_all_lighting_off__The_only_visible_thing_is_the_light_cast_by_the_vent_shaft_.JPG
Inside the tunnel with all lighting off. The only visible thing is the light cast by the vent shaft.RoyApr 24, 2021
28_A_treacle_and_custard_calthemite_formation_on_the_trackbed.JPG
A treacle and custard calthemite formation on the trackbedRoyApr 24, 2021
97128 files on 6476 page(s) 781