|
The blue engineers bricks are where the stairway down to the east-bound platform left the bridgeRoyMar 27, 2021
|
|
The bricks were originally faced with a white glaze. The hand-rail for the stairs has lasted well.RoyMar 27, 2021
|
|
The exit point to get up to street level still hangs onRoyMar 27, 2021
|
|
The east-bound platform edgeRoyMar 27, 2021
|
|
Passing under Deepdale Road. The springs of an old mattress lay across the lineRoyMar 27, 2021
|
|
Looking back to Deepdale Station - credit Preston Digital ArchiveRoyMar 27, 2021
|
|
Deepdale Road looking back to the station siteRoyMar 27, 2021
|
|
St.Paul's RoadRoyMar 27, 2021
|
|
A machete would have been useful getting to the tunnelRoyMar 27, 2021
|
|
The Grey Lady waits withinRoyMar 27, 2021
|
|
Only narrow refugesRoyMar 27, 2021
|
|
A police station has been built above a previous exposed cutting of the tunnel. The foundations can be seen filling the gap.RoyMar 27, 2021
|
|
Heavily soot stainedRoyMar 27, 2021
|
|
It's hard to make out the brick vaulted constructionRoyMar 27, 2021
|
|
A large drain pipe crosses through the tunnel roofRoyMar 27, 2021
|
|
97372 files on 6492 page(s) |
|
|
|
|
|
|
|
|
|
|
|
805 | |
|
|
|
|
|
|
|
|
|
|
|