|
The exit of the main tunnel near Moor Lane RoyMar 27, 2021
|
|
Residents in the properties above have heard the blood-curdling screams of a girl from the tunnel, but no sign of anyone when searched.RoyMar 27, 2021
|
|
A mixture of original wood, and later concrete reinforcing of the sides of the cuttingRoyMar 27, 2021
|
|
Network Rail have rigged some lights up in this sectionRoyMar 27, 2021
|
|
The tunnel wall is in good conditionRoyMar 27, 2021
|
|
A concrete strengthening island to support Adelphi Street aboveRoyMar 27, 2021
|
|
Adelphi St aboveRoyMar 27, 2021
|
|
Underneath Pollard Street, followed by Cold Bath St, and then Maudland BankRoyMar 27, 2021
|
|
All this is usually underwater but the pump to the left has drained it wellRoyMar 27, 2021
|
|
Three sets of tracks went under Maudland Bank after leaving the Maudland Curve at the Preston endRoyMar 27, 2021
|
|
Steelwork constructed at the Dallam Forge in WarringtonRoyMar 27, 2021
|
|
Another view shows the access for the third set of tracks at the far sideRoyMar 27, 2021
|
|
Some track remains within the Maudland CurveRoyMar 27, 2021
|
|
Signals in the Maudland CurveRoyMar 27, 2021
|
|
The point where the PLR line joined the Preston and Wyre Junction (today it's the WCML). If you look carefully there's a warning sign in the trees.RoyMar 27, 2021
|
|
97372 files on 6492 page(s) |
|
|
|
|
|
|
|
|
|
|
|
806 | |
|
|
|
|
|
|
|
|
|
|
|