|
Inside the shelterRoyDec 19, 2020
|
|
The view out from the shelterRoyDec 19, 2020
|
|
The overgrown sidingsRoyDec 19, 2020
|
|
The workmens steps up to the next levelRoyDec 19, 2020
|
|
A side path comes to a chute baseRoyDec 19, 2020
|
|
A bank of chutes. Not good to fall down one of these.RoyDec 19, 2020
|
|
The ramp for loading the chuteRoyDec 19, 2020
|
|
The structures on this level are many and varied. This part resembles a castle fortification.RoyDec 19, 2020
|
|
Through the tunnel and up the steps to the upper levelRoyDec 19, 2020
|
|
An early picture showing the circular Jubilee track at the loading bowl. This area is now buried under vegetation.RoyDec 19, 2020
|
|
The tramroad entrance to the quarryRoyDec 19, 2020
|
|
The line went underneath the Upper Incline bridge. The weigh house in the background.RoyDec 19, 2020
|
|
The view of the bridge from the embankment with the quarry behindRoyDec 19, 2020
|
|
From the other sideRoyDec 19, 2020
|
|
The weigh house from the opposite embankment. The angle of the incline is shown to good effect.RoyDec 19, 2020
|
|
97263 files on 6485 page(s) |
|
|
|
|
|
|
|
|
|
|
|
841 | |
|
|
|
|
|
|
|
|
|
|
|