Last additions - 2020 Season
|
Built to lastRoyAug 15, 2020
|
|
An overflow drain on the canalRoyAug 15, 2020
|
|
InsideRoyAug 15, 2020
|
|
and one in actionRoyAug 15, 2020
|
|
The water flows down this channel and rejoins the canal further alongRoyAug 15, 2020
|
|
The water tower at W.H.Shaw's millRoyAug 15, 2020
|
|
and the chimneyRoyAug 15, 2020
|
|
On borrowed timeRoyAug 15, 2020
|
|
All that remained of the site a week later was the listed office building and clock towerRoyAug 15, 2020
|
|
A narrowboat enters the lockRoyAug 15, 2020
|
|
Some of the locals duckin' aboutRoyAug 15, 2020
|
|
An even older tunnel from the late 1700's leads under the canalRoyAug 15, 2020
|
|
A gradual curve at each endRoyAug 15, 2020
|
|
The centre section is unlit so pitch black at nightRoyAug 15, 2020
|
|
Constructed of stone blocksRoyAug 15, 2020
|
|
2215 files on 148 page(s) |
|
|
|
|
|
|
|
|
|
|
|
29 | |
|
|
|
|
|
|
|
|
|
|
|